Good reasons to conduct an on-site assessment:
In case of damage:
- Restoration to the condition prior to the damage as quickly as possible,
- Reducing costs in case of production downtime
Preventive measures:
- Increased plant availability and/or plant safety
- Root cause analysis for the detection of sporadic errors
- Reduction of sporadic disturbances and
Production shutdowns
- Fire prevention through flashovers
- Maintaining insurance coverage
- Increased machine and system uptime as well as the preservation of the value of the equipment
- Increased competitiveness

